CAPEX and OPEX
Initial Capital Costs (US$ Millions)
Mining Pre-stripping | 17.3 |
Process Plant | 401.3 |
Site Infrastructure | 20 |
Tailings Storage Facility | 8 |
Owner Costs | 5 |
Contingency | 43.4 |
Total Initial Capital | 495 |
LOM Operating Cost (US$ per Tonne)
Mining Cost per Tonne Mined Material | 2.28 |
Mining Cost per Tonne Plant Feed | 10.17 |
Processing Coat per tonne plant feed | 8.44 |
G&A per Tonne Plant Feed | 0.86 |
Total Cost per Tonne Plant Feed | 495 |
Cost
Preproduction Capital (US$ M) | 495 |
LOM Average Cash Cost (US$/oz) | 709 |
LOM Average AISC (US$)/oz | 709 |